Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Pусский |
| No.13703446

- Product Categories
- Friendly Links
- home > Supply > Edit this paragraph Environmental requirements are not in any environment can operate electric basket, if not pay attention to these small details blind, likely to cause unnecessary harm. That electric basket of site work environment must have strict requirements. First, do not use high-voltage lines within 10m range from the basket, in thunderstorms,
Edit this paragraph Environmental requirements are not in any environment can operate electric basket, if not pay attention to these small details blind, likely to cause unnecessary harm. That electric basket of site work environment must have strict requirements. First, do not use high-voltage lines within 10m range from the basket, in thunderstorms,
Information Name: | Edit this paragraph Environmental requirements are not in any environment can operate electric basket, if not pay attention to these small details blind, likely to cause unnecessary harm. That electric basket of site work environment must have strict requirements. First, do not use high-voltage lines within 10m range from the basket, in thunderstorms, |
Published: | 2015-05-05 |
Validity: | 360 |
Specifications: | 600 * 69 * 118 |
Quantity: | 9999.00 |
Price Description: | |
Detailed Product Description: | Edit this paragraph Environmental requirements are not in any environment can operate electric basket, if not pay attention to these small details blind, likely to cause unnecessary harm. That electric basket of site work environment must have strict requirements. At first, within 10m from the high voltage range Do not use the basket, in thunderstorms, fog, snow and wind speed greater than 8.3m / s (equivalent to gust 5) of the harsh climate, non-basket off the job; electric basket Ambient temperature should be controlled to work at -20 ℃ - + 40 ℃; relative humidity less than 90% (25 ℃); supply voltage excursion ± 5%; if night time construction, the construction site should have adequate lighting, illumination should greater than 1501x, and set the alert signal range in construction; construction range below if road or path, you must set the alarm or security gallery under the electric basket and set with conspicuous warning signs and safety oversight personnel. Outside of the work environment for the safe use of electric basket plays a key role! Edit this paragraph hanging position to follow the principle of selecting 1. electric basket when hauling heavy equipment, long haul facilities such as along the longitudinal direction. [2] Some taboo issues edit this section when operating electric basket 1. prohibited to perform dangerous operations in high-voltage power danger zone. 2. strictly prohibited without railings or other safety measures, high operating and walking on a single line the wall. 3. prohibited to perform dangerous operations in high-voltage power danger zone. The operator is prohibited to wear slippers, do not wear helmets and work permit and carry a child to enter the building construction site job basket. 5. Never with dangerous goods, flammable materials at the site of smoking, fire. 6. forbidden to drink, sick and other operations personnel electric basket height. [3] Edit dismantling electric basket of relevant points in this paragraph electric basket after the removal must be lowered to the ground when someone enters before removal. Straightening safety lock rope, hanging off the hammer and then, slowly raise the wire rope safety lock from the inside. Removing the cable, from the ground to the roof plate pump set well tied tight. When removing the cantilever beam, remove the bracket, to move away with heavy rail, neatly stacked, ready for shipment. When laying a springboard in the electric basket, scaffold board material should meet the requirements, full of shops, bars prison, not a probe board. Electric basket outer use safety nets Fine Mesh closed multilayer job to set the protective roof isolation layer, electric basket to be firmly connected with the building when the job. When removing the electric basket, we want to be more efficient, to grasp the main points of its removal can play a multiplier effect, the relevant operators understand the knowledge is very necessary to edit this section Environmental requirements are not any environment operating electric basket, if not pay attention to these small details blind, likely to cause unnecessary harm. That electric basket of site work environment must have strict requirements. At first, within 10m from the high voltage range Do not use the basket, in thunderstorms, fog, snow and wind speed greater than 8.3m / s (equivalent to gust 5) of the harsh climate, non-basket off the job; electric basket Ambient temperature should be controlled to work at -20 ℃ - + 40 ℃; relative humidity less than 90% (25 ℃); supply voltage excursion ± 5%; if night time construction, the construction site should have adequate lighting, illumination should greater than 1501x, and set the alert signal range in construction; construction range below if road or path, you must set the alarm or security gallery under the electric basket and set with conspicuous warning signs and safety oversight personnel. Outside of the work environment for the safe use of electric basket plays a key role! Edit this paragraph hanging position to follow the principle of selecting 1. electric basket when hauling heavy equipment, long haul facilities such as along the longitudinal direction. [2] Some taboo issues edit this section when operating electric basket 1. prohibited to perform dangerous operations in high-voltage power danger zone. 2. strictly prohibited without railings or other safety measures, high operating and walking on a single line the wall. 3. prohibited to perform dangerous operations in high-voltage power danger zone. The operator is prohibited to wear slippers, do not wear helmets and work permit and carry a child to enter the building construction site job basket. 5. Never with dangerous goods, flammable materials at the site of smoking, fire. 6. forbidden to drink, sick and other operations personnel electric basket height. [3] Edit dismantling electric basket of relevant points in this paragraph electric basket after the removal must be lowered to the ground when someone enters before removal. Straightening safety lock rope, hanging off the hammer and then, slowly raise the wire rope safety lock from the inside. Removing the cable, from the ground to the roof plate pump set well tied tight. When removing the cantilever beam, remove the bracket, to move away with heavy rail, neatly stacked, ready for shipment. When laying a springboard in the electric basket, scaffold board material should meet the requirements, full of shops, bars prison, not a probe board. Electric basket outer use safety nets Fine Mesh closed multilayer job to set the protective roof isolation layer, electric basket to be firmly connected with the building when the job. When removing the electric basket, you want to be more efficient, to grasp the main points of its removal can play a multiplier effect, the relevant operators understand the knowledge is very necessary |
Admin>>>
You are the 7006 visitor
Copyright © GuangDong ICP No. 10089450, Ning County Tianpeng Construction Machinery Equipment Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 7006 visitor
Copyright © GuangDong ICP No. 10089450, Ning County Tianpeng Construction Machinery Equipment Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility